- 33 -
Control element
A Glass top light on/off switch with indicator
light (green)
B Digital temperature controller
C ON/OFF switch with indicator light (green)
5. Installation and operation
5.1 Installation instructions
CAUTION!
All installation, assembly and maintenance work must be performed by
specialists with relevant professional qualifications (approved by the
manufacturer or seller) while observing the applicable law in the country in
which the installation is performed as well as the regulations regarding the
safety of the product and workplace.
5.1.1 Preparation for installation
•
Remove the external packaging (wooden and/or cardboard boxes) and utilize it as
waste according to the applicable law in the country in which the installation is
performed.
•
Next, chech the delivery for completeness (see section 4.1 „Technical data“
on
page 31 and „Scope of delivery of the glass top“
on page 34.
•
Take out all accessories, information materials and plastic bags from the inside of
the device.
A
B
C