TESLA TA22FFML-07410A инструкция по эксплуатации онлайн - страница 49


Инструкция TESLA TA22FFML-07410A для устройства сплит-система содержит страницы на русском языке.

Размер файла: 1.05 MB. Состоит из 60 стр.


Вы можете скачать pdf файл этой инструкции: Скачать PDF


Предыдущая
Следующая
background image

49

ENG

Vacuuming (Gas R32)

Exclusive R32 refrigerant pump must be used in making R32 refrigerant vacuum.

Before working on the air conditioner, remove the cover of 
the stop valve(gas and liquid valves)and be sure to retighten it 
afterward.(to prevent the potential air leakage).
1.  To prevent air leakage and spilling tighten all connecting 

nut of all flare tubes.

2.  Connect the stop valve, charge hose, manifold valve, and 

vacuum pump.

3.  Fully open the handle Lo of the manifold valve and 

apply vacuum for at least 15 minutes and check that the 
compound vacuum gauge reads -0.1MPa (-76cmHg).

4.  After applying vacuum, fully open the stop valve with a hex 

wrench.

5.  Check that both indoor and outdoor connections are free 

of air leakage.

Compound meter

-76cmHg

Pressure 

gauge
Manifold 

valve

Handle Hi

Charge 

hose

Vacuum 

pump

Stop valve

(gas valve)

Stop valve

(liquid valve)

Charge hose

Handle Lo

Expelling the air (Gas R410a)

Outdoor unit refrigerant discharging method.

After the pipe side connection is complete, proceed as follows.

Vacuum Pumping Method (R410A refrigerant evacuation must use the vacuum pumping method)

.

Before working on the air conditioner, remove the cover 
of the stop valve (gas and liquid valves) and be sure to 
retighten it afterward (to prevent the potential air leakage).

1.  To prevent air leakage and spilling tighten all 

connecting nut of all flare tubes.

2.  Connect the stop valve, charge hose, manifold valve, 

and vacuum pump.

3.   Fully open the handle Lo of the manifold valve and 

apply vacuum for at least 15 minutes and check that the 
compound vacuum gauge reads -0.1 MPa (-76cmHg).

4.  After applying vacuum, fully open the stop valve with a 

hex wrench.

5.  Check that both indoor and outdoor connections are 

free of air leakage.

Gas part

Quickly 

tighten and

connect the 

nut.

Fully open 

the spindles 

of the liquid 

end and of

the other two 

ends.

Check that all 

indoor and 

Outdoor

connections 

are free of air 

leakage.

The installing torque 

is the same as that 

of the gas end of the 

indoor unit.

Wait for 8 

seconds

Loosen the

temporarily 

fastened

nut by half turn.

Loosen the Hex

wrench by half 

turn.

Liquid part

Compound meter

-76cmHg

Pressure 

gauge
Manifold 

valve

Handle Hi

Charge 

hose

Vacuum 

pump

Stop valve

(gas valve)

Stop valve

(liquid valve)

Charge hose

Handle Lo


Что удобнее для чтения книг?

Планшет
Электронная книга
Смартфон
Книга в бумажном переплёте
Не читаю книг

QR код manualbase.ru
©  2010- ManualBase.ru